Paver Calculator

Count patio pavers and estimate sub-base gravel, bedding sand, edging and jointing sand for any patio or path.

✓ Method shownUpdated By DIYCalcLab Editorial TeamSources (3)How we calculate

Quick answer: A 12 × 10 ft patio with 8 × 4 in pavers and 1/8 in joints needs 568 pavers including 10% waste, plus about 1.48 cu yd · 2.5 tons of compacted base at 4 in and 0.37 cu yd · 0.5 tons of bedding sand. A 4 × 3 m patio of 200 × 100 mm blocks needs about 632 pavers. Pavers = area ÷ ((paver L + joint) × (paver W + joint)).

Region: US · USD · Imperial

5% for straight runs, 10% for herringbone or curves, 15% for complex shapes.

Patios 4–6 in (100–150 mm); driveways 8–12 in (200–300 mm) depending on soil.

Advanced options (waste, sizes, price)

Result

Pavers (incl. 10% waste)

568 pavers

Patio area
120 sq ft
Sub-base
1.48 cu yd · 2.5 tons
Bedding sand
0.37 cu yd · 0.5 tons
Pavers before waste
515.6
Show the math
  1. Area = L × W = 120 sq ft
  2. Pavers = area ÷ ((paver L + joint) × (paver W + joint)) = 515.6
  3. × (1 + 10%) → 568
  4. Sub-base = area × depth = 1.48 cu yd × 2 t/m³; sand = 0.37 cu yd × 1.6 t/m³

Shopping list & cost

Shopping list
ItemSpecQtyCost
Pavers8 × 4 in568—
Paver base (crushed stone)compacted1.48 cu yd ≈ 2.5 tons—
Bedding sandscreeded, not compacted0.37 cu yd ≈ 0.5 tons—
Edge restraintperimeter (exposed edges only)≤ 44 ft—
Jointing / polymeric sandsee bag coverage≈ 2 × 50 lb bag—

Prices are what you enter under Advanced options. Estimates only — check stock and pricing with your supplier.

Diagram

Floor plan diagramA top-down floor plan covered in a tile or plank grid, with length and width labelled. 10 ft 8 ft
Labels update as you type. Focus an input to highlight its dimension.

How to use this calculator

  1. Measure the patio length and width (split curves and L-shapes into rectangles).
  2. Enter the paver size and joint width; most concrete pavers have built-in spacer nibs.
  3. Set waste: 5% for straight runs, 10% for herringbone, 15% for curves and circles.
  4. Set the sub-base depth for your use and soil; driveways need much more than patios.
  5. Use the base and sand tonnage to order from a builders' merchant.

Method & assumptions

Formula
Pavers = Area ÷ ((Paver L + Joint) × (Paver W + Joint)) × (1 + waste %)
Sub-base = Area × Base depth (× ~2.0 t/m³ compacted)
Bedding sand = Area × Sand depth (× ~1.6 t/m³)
Joint
gap between pavers, often 2–5 mm / ⅛ in
Sub-base
compacted crushed stone (US paver base, UK MOT Type 1, AU road base)

Assumptions & limits

  • Densities are typical; ask your supplier.
  • Edge restraint is the full perimeter — reduce it where the patio meets a wall.
  • Driveways and poor soils may need geotextile and deeper base — follow manufacturer guidance.

Rounding: purchase quantities are always rounded up to whole bags, boxes, sheets or bundles. See our methodology.

Worked examples

Imperial: 16 × 12 ft patio, 6 × 9 in pavers, herringbone

  1. Area = 192 sq ft; footprint = 6.125 × 9.125 in = 0.388 sq ft
  2. 192 ÷ 0.388 = 494.7; +10% = 544.2 → 545 pavers
  3. Base at 6 in = 96 cu ft = 3.56 cu yd

Metric: path 8 × 1 m, 200 × 100 mm blocks

  1. 8 m² ÷ (0.203 × 0.103) = 382.6; +5% = 401.7 → 402 blocks
  2. Sub-base 100 mm = 0.8 m³ ≈ 1.6 t

In depth: pavers planning notes

The layers under a paver patio

A paver patio is a system. On top is the paver surface, sitting on a bedding layer of sharp sand or fine screenings — usually about 1 in (25–30 mm) screeded flat. Under that is a compacted sub-base of crushed stone, typically 4 in (100 mm) for patios and paths and 6–8 in (150–200 mm) or more for driveways and poor soils. The edges are held by restraint — a concrete haunch or plastic or metal edging — so the pavers cannot creep.

The calculator estimates all three: pavers by count, sub-base by volume and weight at a compacted density of about 2.0 t/m³, and bedding sand at about 1.6 t/m³. Compaction is important: lay and compact the sub-base in layers of 2–3 in (50–75 mm) with a plate compactor.

Paver size, pattern and waste

Paver count depends on the face size plus the joint. Many concrete pavers have spacer nibs that set a joint of about 2–3 mm, while clay pavers are often laid with a 3 mm sand joint. Patterns change the waste: running bond and stack bond need 5–10% extra, herringbone and circular patterns 10–15%, because the edges are full of angled cuts.

Mixed-size patterns sold as "random" or "multi-size" packs are sold by area, not count, so use the area result. Buy pavers from a single production batch if possible, and mix from several pallets as you lay to blend any colour variation.

Fall is essential so water runs off — typically about 1:60 to 1:80 (around ⅛–¼ in per foot) away from the house. Joint sand is brushed in after compaction; polymeric sand reduces weeds and washout but must be installed exactly as the manufacturer says.

Reference table

Typical sub-base depths (compacted)
UseDepth
Garden path / patio, good soil4 in (100 mm)
Patio, clay or soft soil6 in (150 mm)
Car driveway8–12 in (200–300 mm)
Bedding sand (screeded)1 in (25–30 mm)

Key facts

200 × 100 mm block paving
≈ 48–50 per m² with joints
4 × 8 in pavers
≈ 4.3–4.5 per sq ft
Compact base in lifts of
≤ 4 in (100 mm)

Tips & common mistakes

  • Slope the patio away from buildings — about 1:60 to 1:80 (¼ in per foot is a common US rule).
  • Compact the sub-base in layers with a plate compactor; most patio failures start below the pavers.
  • Order 5–10 spare pavers from the same batch for future repairs.

Frequently asked questions

How many pavers do I need for a 10×10 patio?

With 4 × 8 in pavers and ⅛ in joints, about 430 before waste and around 475 with 10% extra.

How much gravel do I need under pavers?

For a patio, 4–6 in (100–150 mm) of compacted base: 100 sq ft at 4 in is 1.23 cu yd (about 1.9 tonnes / 2.1 short tons compacted).

How much sand do I need for pavers?

About 1 in (25–30 mm) of bedding sand — 100 sq ft needs 8.3 cu ft. Jointing sand is extra.

What waste factor should I use for pavers?

5% for straight patterns, 10% for herringbone, 15% for curves, circles and many cuts.

Can I lay pavers directly on soil?

Not for a durable result. Pavers need a compacted granular base and a sand bed to stay level.

Sources

  1. ICPI – Interlocking Concrete Pavement Institute — checked 2026-10; verify before launch
  2. Interpave (UK) – precast concrete paving guidance — checked 2026-10; verify before launch
  3. Belgard – paver installation guide — checked 2026-10; verify before launch

Default values (bag yields, coverage rates, densities) are typical figures from manufacturer literature. Always check the label on the product you buy.

Related calculators

Cite or embed this calculator

DIYCalcLab. “Paver Calculator.” Oct 18, 2026. https://diycalclab.com/landscaping/paver-calculator/

An embeddable version for blogs and contractor sites is planned.

Estimates only. Verify quantities with your supplier and local building codes. For structural, electrical or safety-critical work, consult a licensed professional. Full disclaimer.